000 05128namaa22004811i 4500
003 EG-GICUC
005 20250522083835.0
008 240306s2023 ||| |||frm||| 000 0 ara d
040 _aEG-GICUC
_bara
_cEG-GICUC
_dEG-GICUC
_erda
041 0 _aara
_bara
_beng
_dara
049 _aإيداع
082 0 4 _a346
_221
097 _aPh.D
099 _aLaw 02 PHD 2023
100 0 _aسامي مصطفى عمار الفرجاني
_eمؤلف.
245 1 2 _aالمسؤولية المدنية عن أعمال مقاول البناء :
_bدراسة مقارنة /
_cإعداد سامي مصطفى عمار الفرجاني ؛ إشراف أ.د سعيد سليمان جبر.
246 1 1 _aCivil Liability for the Work of the Building Contractor :
_bComparative Study /
264 0 _aالقاهرة :
_bكلية الحقوق - جامعة القاهرة،
_c2023.
300 _a275 صفحة ؛
_c30 سم. +
_eCD.
336 _atext
_2rda content
337 _aUnmediated
_2rdamedia
338 _avolume
_2rdacarrier
502 _aأطروحة (دكتوراه) - جامعة القاهرة، كلية الحقوق، قسم القانون المدني 2023.
504 _aببليوجرافيا: صفحات 261-266.
520 _aمن خلال دراسة عقد مقاولة البناء والأحكام المنظِّمة له، لقد اشترط المشرِّع الليبي في المادة (650) مدني مسئولية كل من المقاول والمهندس المعماري عن الأخطاء التي تقع أثناء تنفيذ الالتزام، وذلك في مواجهة رب العمل باعتباره طرف ضعيف في العقد وجعل مدة الضمان عشرة سنوات من وقوع التهدُّم أو ظهور العيب، فالتسلم من قِبَل رب العمل لا ينتهي بموجبه مسئولية المقاول بل تستمر لمدة عشرة سنوات من تاريخ التسلُّم وثلاثة سنوات من ظهور العيب ولا يستطيع المقاول التخلص من المسئولية إلَّا عن طريق السبب الأجنبي، في ظهور العيب تقوم المسئولية على المقاول وهي قرينة قانونية قاطعة لا يستطيع التخلص منها، وقد افترض المشرع التضامن بين كل من المهندس المعماري والمقاول في مواجهة رب العمل. ويقع التزام على عاتق المقاول وهو تسليم العمل إلى رب العمل حسب المواصفات وكراسة الشروط في العقد خاليًا من أية عيوب وعلى رب العمل إعطاء الأجر إلى المقاول بمجرد تمام التسلُّم من قِبَله بدون تحفُّظ.
520 _aThrough the study of the construction contracting contract and the provisions regulating it, the Libyan legislator has stipulated in Article (650) civil the responsibility of both the contractor and the architect for errors that occur during the implementation of the obligation, in the face of the employer as a weak party to the contract and make the warranty period ten years from the occurrence of the demolition or the appearance of the defect, the receipt by the employer does not end under which the contractor's responsibility does not end, but continues for a period of ten years from the date of receipt and three years from the appearance of the defect The contractor can only get rid of liability through the foreign cause, in the appearance of the defect, the responsibility is based on the contractor, which is a conclusive legal presumption that he cannot get rid of, and the legislator has assumed solidarity between both the architect and the contractor in the face of the employer. The contractor has an obligation to deliver the work to the employer according to the specifications and the specifications in the contract free of any defects, and the employer must give the wage to the contractor as soon as it is received by him without reservation.
546 _aالنص بالعربية والملخص باللغة الإنجليزية والعربية.
650 0 4 _aالقانون المدني
650 0 4 _aالمسئولية المدنية
650 0 4 _aعقد المقاولة
650 0 4 _aالبناء
_xرقابة
653 _aمقاول البناء
653 _aالمسؤلية المدنية
653 _aالمسئولية المدنية لمقاول البناء
653 _aالضمان العشري
655 4 _aرسائل جامعية
_zجامعة القاهرة
_xالقانون المدني
700 0 _aسعيد سليمان جبر
_eمشرف.
710 2 _aجامعة القاهرة
_bكلية الحقوق
856 _uhttp://195.246.42.239/public/th/T02-00023.pdf
900 _b2023
_cسعيد سلمان جبر
_dحســن حســين الـــبراوي
_dحمـــدي أحمــد سـعـــــد
_Uجامعة القاهرة
_Fكلية الحقوق
_Dقسم القانون المدني
905 _aEman
_eEman
942 _2ddc
_cTH
_e21
_n0
999 _c2523